  • 2011 to Present
  • 1995-2010
  • 2011
    Jiangsu Kainter Machinery Manufacturing Co., Ltd. established for global expansion
  • 2013
    Strand Jack Series successfully developed
  • 2014
    PLC Synchronized Lifting System applied in Wuyun Tower relocation/correction (Fujian heritage structure
  • 2015
    Synchronized Pushing System employed in steel box girder incremental launching
  • 2015
    Variable-frequency Synchronized Lifting System implemented in Beijing-Shanghai HSR Tianjin Bridge settlement remediation
  • 2016
    Synchronized Launching System used for coal storage roof installation at Jiangsu Shagang Group
  • 2016
    Intelligent Axial Force Support System deployed in China Railway metro construction
  • 2017
    48-point Synchronized Lifting System corrected nuclear power plant administration building
  • 2018
    2700-ton Electric Shovel Synchronized Graded Lifting Equipment exported to Oyu Tolgoi Gold Mine (Mongolia)
  • 2018
    National High-Tech Enterprise certification awarded
  • 2019
    Automated 3D Adjustment Equipment exported to Sembcorp Marine (Singapore) for shipbuilding
  • 2019
    Multi-point Auto-Balancing Positioning System exported for segment installation in Melbourne West Gate Tunnel TBM
  • 2020
    Integrated Lifting-Pushing-Hoisting Smart Control System applied in CCCCC bridge projects
  • 2020
    Step-type Intelligent Launching System positioned box girders at Guangfo Expressway Shayong Interchange
  • 2021
    High-Precision Smart Weighing System utilized in Linde Modular Assembly (LMA) project
  • 2021
    Transformer Smart Moving System deployed in confined-space maintenance at Three Gorges Hydropower Station
  • 2022
    High-rise building lifting/correction
  • 2022
    Arch bracing installation/alignment for Jingxiong Expressway
  • 2023
    8-point Strand Jack Synchronized Hoisting System lifted 2400T Buddha statue (Yangon, Myanmar)
  • 2023
    64-point Synchronized Weighing applied to FLNG facility at China Merchants Heavy Industry
  • 2024
    Semi-automated 3D Adjustment Equipment positioned world's largest LNG B-type fuel tank
  • 2024
    300T Smart Heavy-load Transfer Cart moved LPG tanks at China Merchants Group
  • 2024
    Step-lifting System with SPMT modules demolished old bridge on Jinggang'ao Expressway (Hengdong, Hunan)
  • 2024
    Heavy Skidding System installed transformer in ELKO, Latvia
  • 2024
    Fujian Jianke Patriotic Overseas Chinese Residence relocation
  • 2025
    Synchronized Launching for Hong Kong swimming pool roof installation
  • 2025
    Smart Synchronized Leveling System ensured precision for A-type tank installation
  • 2025
    Step-lifting Equipment demolished 3200-ton urban overpass
  • 2025
    Step-lifting System implemented in Xinjiang's first modular rapid bridge demolition
  • 1995
    Taizhou Feiyue Machinery Tool Factory developed first 100 ton Hydraulic Cylinder successfully
  • 1996
    Successfully Developed 300-ton Hydraulic Jack
  • 1997
    Passed ISO 9001 Quality & Management System Certification
  • 1998
    500-ton Hydraulic Jack applied in rotary kiln maintenance lifting at Gezhouba Cement Plant
  • 1999
    24×500-ton Hydraulic Jacks deployed for blast furnace maintenance at Ansteel Group
  • 2000
    1000-ton Heavy-Duty Hydraulic Jack utilized in rotary kiln overhaul at Conch Cement
  • 2001
    CE Certification (EU) obtained
  • 2005
    PLC Multi-point Synchronized Lifting System R&D success; implemented in Wuhan Yangtze River Bridge maintenance
  • 2006
    12-point PLC Synchronized Lifting System applied in rubber bearing replacement on Shanghai-Nanjing Expressway
  • 2006
    24-point PLC Synchronized Lifting System deployed on Beijing-Shanghai Expressway bridge rehabilitation
  • 2007
    36-point Synchronized Lifting System used for rubber bearing replacement on Shanghai Lupu Bridge